Story pole requirements: what seven California policies ask, and where a rendering counts

When Malibu, Los Gatos and five other California jurisdictions require story poles, who certifies them, how long they stay up and where a rendering is accepted.

Aurum Render · · 7 min read
Story pole requirements: what seven California policies ask, and where a rendering counts

Story poles are temporary poles put up on the site of a proposed house or addition, joined at the top by orange netting or brightly colored tape, so that the neighbors and the planning commission can see how tall and how big the building will be before anyone votes on it. California has no statewide story pole rule. Each city or county writes its own policy, and the policies differ on when poles are needed, who certifies them, how long they stay up and whether a rendering can stand in for them.

This guide compares seven official policies, each read at its source in October 2026, from the coast at Malibu and Solana Beach to the hill towns around San Francisco Bay. It isn’t legal advice: confirm the current policy with the planning department before anything goes up on site.

Seven policies at a glance

Story pole requirements in seven California jurisdictions
When poles are neededCertified byWhen they go up and come downRenderings
MalibuWhen needed: Every Coastal Development Permit, and certain projects under Administrative Plan Review; the Planning Manager can waive them where no scenic impact is possibleCertified by: A licensed surveyor, civil engineer or architect for new houses, new commercial buildings, primary view issues and scenic areas; never the ownerTiming: Before the hearing is noticed; removed within seven calendar days after the final appeal periodRenderings: No alternative named
Los Altos HillsWhen needed: New buildings, second-story additions, additions over 900 square feet or raising the roof, and larger accessory structuresCertified by: The project's surveyor or civil engineer sets the corner points; the applicant sends staff photographsTiming: Before public notice and at least 10 days before the hearing; up until the appeal period has passedRenderings: Homes up to 19 feet and 4,000 square feet with no variances are exempt if a 3D rendering of at least 24 by 36 inches is posted beside the hearing notice
Los GatosWhen needed: Two-story houses and second-story additions where both neighbors on that side of the street are single-story; variances; new non-residential buildings; new buildings and second stories on hillside and historic propertiesCertified by: A licensed surveyor or civil engineer in writing, with photographs from marked vantage pointsTiming: Before neighbors are notified; up until 60 days after the first hearing or the end of the appeal period, whichever is firstRenderings: Simulations or models replace poles for buildings over 55 feet and qualifying affordable housing; project signs carry a perspective, 3D image or photo simulation
PiedmontWhen needed: New houses and detached structures in design review, and upper-level additions where a neighbor's light, view or privacy is in questionCertified by: A California licensed land surveyor or civil engineer, on a stamped form with photographsTiming: Verified by noon, 14 days before the Planning Commission hearing, without exceptionRenderings: No alternative named
Monte SerenoWhen needed: Second-story additions, and new structures or additions over 500 square feetCertified by: A California registered land surveyor, to within three inches of the plansTiming: Two weeks before the hearing; up for 10 days after the final decisionRenderings: No alternative named
Solana BeachWhen needed: New buildings and additions under review; the whole envelope is poled, chimneys, balconies and exterior stairs includedCertified by: A licensed surveyor or civil engineer, on the approved story pole plot planTiming: In place before the View Assessment Commission's first hearing; poles that don't match the plan can push the hearing backRenderings: No alternative named
Santa BarbaraWhen needed: On County land, case by case, most often at the request of the Board of Architectural ReviewCertified by: The surveyor, architect, landscape architect or contractor who prepared the plan or put up the polesTiming: At least three days before the board meets; up for at least seven days after itRenderings: No alternative named; large projects post a plan and legend on site and online

Where a rendering is accepted, or required

Two of the seven policies write renderings into the rules.

Los Altos Hills trades the poles for a picture on smaller homes. Its policy, updated by the City Council on September 18, 2025, exempts a single-family residence that is no more than 19 feet high and 4,000 square feet in floor area, and that asks for no variances or exceptions, on one condition: the owner displays a 3D rendering of the proposed development beside the public hearing notice, at least 24 by 36 inches. Multifamily buildings up to 19 feet qualify the same way. A taller or larger new home still needs poles, set out by the project’s surveyor or civil engineer and joined by a two-foot band of orange snow fencing along every ridge and eave.

Los Gatos goes further for tall and affordable buildings. Under the policy the Town Council adopted on April 16, 2024, buildings over 55 feet and affordable housing projects that meet its deed-restriction thresholds must use alternatives in place of story poles, and multifamily and mixed-use projects with housing may choose them. The alternatives are digital imagery simulations, computer modeling, scale models or other visual techniques, prepared by the Town’s consultant with the applicant paying for the work and its review. The same policy puts a picture in front of passers-by: every permit application with public notice needs a project sign, and on most projects up to three-quarters of the sign describes the project, with a color perspective drawing, a three-dimensional image or a photographic simulation. Single-family remodels, and projects with no exterior changes under review, don’t have to show the image.

3D exterior rendering of a stepped contemporary home with dark cladding, planted terraces and a slatted gate

What the poles have to show

The policies agree on the purpose, which is height and bulk at their real size, and differ on the details.

  • Rooflines and ridges. Los Altos Hills and Monte Sereno both ask for a two-foot band of orange netting along the roofline. Malibu asks for orange mesh about a foot wide joining the poles along every roof and ridgeline.
  • Height markings. Malibu paints the top foot of each pole black and marks it at 18 feet above finished or natural grade, whichever gives the lower building, and at every foot above that. Solana Beach marks its white poles at every foot, with every fifth mark in a contrasting color, and numbers each pole to match the certified plot plan.
  • Footprint and floor levels. Monte Sereno outlines the footprint and each floor level with bright ribbon at least two inches wide, a different color for each.
  • Materials. Malibu wants 2x4 lumber or similar and refuses PVC pipe; Los Altos Hills also refuses plastic piping. Solana Beach asks for white PVC, and Piedmont sets no required materials as long as the poles are clearly visible and stable.
  • Photographs. Los Altos Hills and Piedmont want photographs of the installed poles. Los Gatos wants them from a variety of vantage points, with each vantage point marked, and in Malibu the case planner visits to verify and photograph the poles before public notice begins.

The height on the poles also has to be the finished height. Los Altos Hills says grading should be accounted for in the height of the poles. In Solana Beach the link runs on into construction: at framing inspection, a height certification has to match exactly the maximum height shown on the story pole height certification.

Renderings and story poles should agree

A commission that has stood in a neighbor’s yard looking at orange netting will compare it with the picture on the screen. If the rendering’s roof sits lower than the poles, or the house in the rendering looks narrower than the outline on site, neither will be trusted. So we build the model from the same plan set the surveyor certified the poles to, set it on the grades and heights in those plans, and render it from the places the commission will look: the street, the neighbors’ side of the site and the vantage points the poles were photographed from. When the design changes, the poles and the renderings change together.

That matters most where views are the argument, as on the coast. Our Malibu page covers the city’s view rules, and our comparison of what nine cities’ review boards ask renderings to show covers design review beyond the poles. Historic districts and homeowners associations add their own requirements: see renderings for a historic district review and renderings for an HOA architectural review.

3D exterior rendering of a two-story home with taupe-framed gables over white cladding, a stacked-stone pier beside a timber front door and a charcoal double garage under a blue sky

A checklist before the poles go up

  1. Read your city’s current policy, or the planning department’s handout, for the triggers, the deadline and the materials.
  2. Get the story pole plan approved first where the city reviews one, as Malibu, Solana Beach and Santa Barbara County do.
  3. Book the surveyor early. Piedmont’s verification deadline is noon, 14 days before the hearing, without exception, and Monte Sereno’s certification is due two weeks before it.
  4. Photograph the poles from where the neighbors will see them, and note where each photograph was taken.
  5. Commission the renderings from the same plan set, so the poles, the drawings and the pictures show one building.
  6. Keep the poles up until the appeal period ends, then take them down promptly: in Malibu within seven calendar days, in Monte Sereno within a week of its 10-day period.

Sources

Each document was read in October 2026. Policies change, so confirm the current version with the city or county before the poles go up.

FAQ

Questions buyers ask

What are story poles?

Temporary poles put up on a site and joined by netting, tape or string, so that they trace a proposed building's corners, rooflines and ridges at their real height. Neighbors and the planning commission can then see the size of a house or addition before it is approved. In carpentry a story pole is something else: a marked stick used to transfer measurements.

Who certifies story poles?

Usually a licensed land surveyor or civil engineer. Piedmont wants a stamped certification form with photographs from a California licensed land surveyor or civil engineer by noon, 14 days before the Planning Commission hearing. Monte Sereno's surveyor certifies the poles to within three inches of the plans. Malibu also accepts an architect, but never the property owner.

How long do story poles stay up?

Through the decision and the appeal period. Malibu has them removed within seven calendar days after the final appeal period expires, Monte Sereno keeps them up for 10 days after the final decision, and Los Gatos keeps them until 60 days after the first public hearing or the end of the final appeal period, whichever comes first.

Can a rendering replace story poles?

In some towns. Los Altos Hills exempts a single-family home no taller than 19 feet and no larger than 4,000 square feet that asks for no variances or exceptions, provided the owner displays a 3D rendering at least 24 by 36 inches beside the public hearing notice. Los Gatos requires simulations, computer models or scale models instead of poles for buildings over 55 feet and for qualifying affordable housing, and lets multifamily and mixed-use projects choose them; there the Town's consultant prepares the simulations, at the applicant's cost.

Do story poles have to show the whole building?

That depends on the city. Solana Beach asks for the entire three-dimensional envelope, including chimneys, balconies, eaves deeper than two feet and exterior stairways. Santa Barbara County asks for enough poles to show mass, bulk, height and scale, and says they don't have to show every articulation of the building.

Do the story poles set the approved height?

The approved plans do. Santa Barbara County's guidelines say site improvements must comply with the approved plans rather than with the story poles. Solana Beach links the two: at framing inspection, the certified height must exactly match the maximum height on the story pole height certification.

What does a rendering for a design review hearing cost?

At Aurum, an exterior still starts from $1,200, and each extra view of the same design costs less than the first because the model already exists. Most stills are delivered three to four business days after the drawings are settled, and the quote fixes the price and the delivery date before work starts.

Start a project

Get a fixed quote

A fixed price, scope and delivery date by the next business morning. No deposit for registered businesses.

Drawings can follow by email once we reply, or use the full quote form to add timing, budget and more detail.

We use these details only to reply to your inquiry and prepare a quote. The form also tells us how you reached us — the site that referred you, the pages you viewed and your approximate location — so we know what brings inquiries. See our privacy policy.