Skip to content
Aurum

What design review boards ask renderings to show: nine US cities compared

What nine US cities' review boards ask renderings to show, from New York's Landmarks Commission to Miami's UDRB, with every official checklist linked.

Aurum Render · · Updated · 6 min read
What design review boards ask renderings to show: nine US cities compared

There is no national rulebook for the renderings a design review board sees. Each city publishes its own submission checklist, and boards in the same city can ask for different things: one wants night views, another refuses map screenshots, a third wants every camera keyed to a photo map. Below, nine cities’ own documents are compared side by side, with each official source linked and a link to our page for that city.

Nine cities at a glance

What design review boards in nine US cities ask renderings to show
Who reviewsWhen it appliesWhat the images have to show
New YorkWho reviews: Landmarks Preservation Commission; Public Design CommissionWhen it applies: Work on landmarks and in historic districts; projects on or over City-owned propertyWhat to show: Photo montages from public streets at a 6-foot eye level, each numbered, labeled and keyed to a site map beside the existing view; for the Public Design Commission, pedestrian-view renderings with context and a key plan
Los AngelesWho reviews: City Planning Commission and Area Planning Commissions; neighborhood design review boardsWhen it applies: Required for cases those commissions decide, highly recommended for most othersWhat to show: Color renderings and color elevations, site photographs keyed to an index map, and a 3D model for Major Projects; the Mulholland board adds a visibility study with at least seven lines of sight
MiamiWho reviews: Urban Development Review BoardWhen it applies: Projects over 200,000 square feet, or others the Planning Director refersWhat to show: Pedestrian perspectives from ground level to the third story, day and night renderings, interiors where they shape the design, an aerial of the surrounding blocks and line-of-sight studies
ChicagoWho reviews: Department of Planning and Development; Committee on Design; Commission on Chicago LandmarksWhen it applies: Every Planned Development; selected ones, such as those 80 feet or taller, go to the Committee on DesignWhat to show: No fixed image list: design review against the Design Excellence principles, and a final packet that answers every review comment, due 20 days before the Plan Commission hearing
HoustonWho reviews: Houston Archaeological and Historical CommissionWhen it applies: Exterior changes to designated historic properties, including new buildings in historic districts; the city has no zoningWhat to show: Street photographs of the site and of both blockfaces, existing and proposed elevations to one scale, with renderings in support; filed 22 days before the monthly meeting
PhoenixWho reviews: Planning & Development; single-family design review under Section 507When it applies: Commercial, multifamily and subdivision projects from pre-application; new subdivisionsWhat to show: Colored elevations of every side with materials, textures and colors labeled, site photographs from the curb, and each exterior option of a standard plan as its own elevation
BostonWho reviews: Landmarks Commission and ten historic district commissionsWhen it applies: Landmarks and historic districtsWhat to show: Visuals of the finished work, current color photographs with no Street View screenshots, and for rooftop work a photographed mock-up, sightline sections and context elevations
PhiladelphiaWho reviews: Civic Design Review; Historical Commission concept reviewWhen it applies: Projects referred to Civic Design Review; historic propertiesWhat to show: At least two rendered views, one from street level, with exterior materials shown, a 3D massing model in context and labeled elevations, filed as an 11-by-17-inch PDF
AustinWho reviews: Design Commission, which advises the City CouncilWhen it applies: Every Downtown Density Bonus project; municipal buildings, downtown alley vacations and items the Council or a sponsor brings to itWhat to show: Elevations of every street side, alleys included, and renderings or 3D views from street level and from above, with priority on street-level views of the pedestrian experience; filed 10 days before the meeting

What most of the checklists share

  • Eye-level views. New York judges visibility at 6 feet from public streets, Philadelphia asks for a street-level perspective, and Miami’s pedestrian views run from the ground to the third story. Austin’s Design Commission gives street-level views of the pedestrian experience priority over the view from above. An aerial explains a site; the decision usually turns on the view from the sidewalk.
  • Cameras the board can locate. New York keys each montage to a site map, and Los Angeles keys its site photographs to an index map. A view whose camera cannot be found on a plan is easy to doubt.
  • Materials that match the elevations. Los Angeles, Miami, Phoenix and Philadelphia all want elevations with the materials and colors labeled, so the renderings have to show the same products in the same colors.
  • Current photographs of the real street. Boston does not accept screenshots from Street View or other online maps, and Houston asks for the buildings across the street as well as the site’s own blockface.
  • Before and after from one spot. New York sets each proposed view beside the existing one, and Boston’s rooftop reviews compare the design with a mock-up photographed from the roof and from the ground.
  • Finished on time. Chicago’s final packet is due 20 days before the hearing, Houston’s application 22 days before the commission meets, Austin’s backup 10 days before the Design Commission meeting, and Miami’s board takes no new materials after its agenda is published unless the liaison allows it.
3D streetscape rendering of a corner view of two-story townhouses with balconies, white pergola hoods, dark brick bases and purple-leaf street trees, with people walking on the sidewalk

How we work to a board’s checklist

We start from the checklist the project is filed under, not a standard package. The building is modeled once, from the drawings being filed. The cameras go where the checklist puts them, at eye height or at the points on the photo map; the materials and colors come from the labeled elevations; and every before-and-after pair is rendered from an identical position. The images are finished ahead of the filing deadline, so what the board reads is what was filed. How a project runs sets out each stage, and you can send us your drawings for a fixed quote.

3D exterior rendering of a pair of dark gabled riverfront homes seen from the street, each with a white-framed upper floor

If your city is not listed

Many cities and counties publish no rendering checklist at all, and many boards only recommend images. There, the staff who will write the report are the best guide: Houston asks applicants to talk to staff before finalizing a design, and Boston suggests an informal advisory presentation before a major project is filed. For a home in a planned community, see renderings for an HOA architectural review; for a landmark or a historic district, see renderings for a historic district review. Our city pages cover 31 US markets and what shapes approvals in each, and for the shadow studies that often go with a review package, see shadow study rules in US cities. Where the town asks for story poles as well, our comparison of what seven California story pole policies ask covers who certifies them and where a rendering is accepted instead.

Sources

Each document was read for our city pages in October 2026, and Austin’s on 3 November 2026. Checklists change, so confirm the current version with the city before you file.

FAQ

Questions buyers ask

Do design review boards require renderings?

Some require them and some only recommend them. Los Angeles requires color renderings for cases decided by the City Planning Commission or an Area Planning Commission and highly recommends them for most others, and Philadelphia's Civic Design Review asks for at least two rendered views. Elsewhere, elevations and photographs carry the application and renderings support them, so the board's own checklist comes first.

What eye height should design review renderings use?

Pedestrian eye level, unless the checklist names another. New York's Landmarks Preservation Commission judges visibility from public thoroughfares at 6 feet, Philadelphia asks for a street-level perspective, and Miami's review board wants pedestrian views from ground level up to the third story.

Can Google Street View images be used in a design review application?

Not in Boston, where the Landmarks Commission requires current, high-quality color photographs and does not permit screenshots from Street View or other online maps. Even where a board allows them, new photographs taken from the points the board will check make the before-and-after views far more convincing.

When do the renderings for a design review need to be finished?

Before the filing deadline, because several boards refuse late material. Chicago's final Plan Commission packet must arrive 20 days before the hearing, Houston's historic applications are due 22 days before the commission meets, and Miami's review board takes no new materials after its agenda is published without the liaison's permission.

Start a project

Get a fixed quote

A fixed price, scope and delivery date by the next business morning. No deposit for registered businesses.

Drawings can follow by email once we reply, or use the full quote form to add timing, budget and more detail.

We use these details only to reply to your inquiry and prepare a quote. The form also tells us how you reached us — the site that referred you, the pages you viewed and your approximate location — so we know what brings inquiries. See our privacy policy.